The executive plan has been written up on the base of the
definitive plan inragione of the improvements proposed
in phase of contest. Particular attention it has been placed
to the respect of the principles enunciates you
from Niemeyer in the plan preliminaree to the choices
made in phase of writing of plans definitive.
All the choices have been oriented moreover to the
improvement of the acoustic yield of the salache,
like already indicated in the acoustic relation that
accompanied the progettodefinitivo, introduced in that
center some problematic ones. In the sixty days puttinges
to disposition from the station contracting out the group of planning
has worked in horizontal way, integrating and elaborating in
parallel all the input coming from from the various actors.
A nucleus dicoordinamento composed from a responsible for the
architecture, one for the systems and from the strutturista
has operated in continuous synergy with the editors of the
definitive plan and with the RUP. During the encounter to cadence
weekly magazine various the problematic ones have been of time
in time faced and resolved concurring the elaboration of beyond
three hundred tables of executive plan that will concur the construction
in narrow times of the manufatto one.
The building has been subdivided in three blocks, function also of the
relati to you joints of expansion. The first block is the auditorium,
the second is that one of the parking, while the third party is
that one called support building. In the third party block, that it
accommodates the bar of the public square, a system of scales
and the book shop/biglietteria, not there are substantial
modifications regarding the definitive plan. The improvements
proposed during contest relatively to the furnishings and adapted
the structures have been cantierabili yields to the constructive requirements.
In the block of the parking it has not been modified the distributive
system but it has been opted for a structural solution that replaces
the system of beams estradossate with with of beams to thickness
with solaio slowly. That concurs not to have cassettonato in cover
and therefore to avoid dangerous bags of smoke in fire case.
In reason of that they have been leggermente rimodulate the quotas
the impalcati ones. For the auditorium it has been realized a
advanced acoustic analysis of the atmosphere in which they
have been simulated with greater detail, regarding the relation
produced in phase of migliorativa proposal, is geometries of
knows it that the materials inner of covering.
That has concurred to verify the hypotheses of the definitive
one and to propose the solutions of the executive.
In particular it has been produced a mobile system of
reflecting panels in meth-acrylate waved posizionati on the
blanket of the platea and to sides of the same one.
The panels will be enliven to you in order to adapt know it
it to the various orchestrali configurations. In the attached
acoustic relation they come better described to the principles
and the adopted solutions. In the definitive plan for the great
vetrata wall that separates the public square from knows it,
was previewed one double skin in glass with inner tube from
20 cm of thickness. During executive, also in order to adapt the
plan to the normative new on the thermal dispersions, one
has been previewed interstice between glasses from 60 cm
with air circulation to the inside. In order to support this double
skin in glass it has been inserted a metallic pillar structure double
that collaborates also to the support of the jolt, by means of tirantatura
with strands in steel. On the vetrata opposite wall to the large one,
online with proposed how much in phase of migliorativa proposal,
has been planned a system of mobile brush-work with various
system of sonorous refraction, that will concur "to come to an agreement"
knows it it on the various orchestrali requirements. Of continuation
they come shortly described the solutions adopted,
ambient for atmosphere, brought back in detail in the
executive diagrams and capitolato the special prestazionale.
In the same one the cards Work Breakdown Structure
(WBS are inserted) that they discipline the modalities
of realization of the special elements.
Year: 2006
Location: Ravello
Description: Detail design and support the implementation of construction of the "Oscar Niemeyer"
Client: Comune of Ravello
Costruction Cost: € 13.186.576
Category: Id, Ig, IIIa, IIIb, IIIc
ARCHITECTURAL PLAN
PLAN Manager: Gnosis Architettura
Architects: Augusta Cyrillo Gomes
STRUCTURAL PLAN
Interprogetti s.r.l.
Ing. Giuseppe Sarubbi
SYSTEMS ELECTRICAL WORKERS
Macchiaroli & Partners S.r.l
Ing. Luigi Conte
CONSULTANTS:
For the acoustics: Prof. Ing Carmine Ianniello
For the architectonic planning: Prof. Arch. Renato De Fusco,
Prof. Arch. Alexander Castagnaro