gnosis

Habita 79 Hotel

Pompeii (NA)

Year: 2019

Client: Diomira Spa

Location: Pompei (NA)

Performance: Preliminary, final and executive design and artistic direction for the renovation of the former Hotel del Pellegrino, its outdoor areas and roof.

Status: completed

Architectural project: Gnosis Progetti

The project has seen a complete and radical re-functionalization that has returned an accommodation facility that now offers 80 rooms and includes: a large lobby, a convention area with two conference rooms, a SPA and fitness area, a multipurpose room with related kitchen, a bistro restaurant, a roof garden that hosts events, a bar, a gourmet restaurant and a solarium.
In order to
redevelop the entire hotel
, it was decided to assign punctual functions to the planned outdoor areas in order to give them specific uses and, therefore, full vitality at different times of the year and at different times throughout the day, making them usable even independently of the accommodation.
A design of water
was proposed, with fountains, cascading pools, and level paths that re-propose the city of Pompeii’s connection to the cult of water, used both for thermal cures and as a health source. The roof was initially characterized by the strong presence of pillars and beams supporting a massive concrete roof; today a light structure with wide spans, resting on a few elements, distinguishes the new roof garden. Eight filiform pillars are incorporated into the bar volume, and the supporting structure is completely cantilevered with metal tubing of variable
elliptical cross-section
, consisting of four main elements of about 24 meters span and secondary warping consisting of 13 elements with variable span.
The roof now consists of a double-layer Ethylene TetrafluoroEthylene ETFE (partially florinated polymer) membrane lens mounted on an aluminum tubular structure, and also functions as a sunshade.
With this structure, the roof has acquired a
completely different look
, more in keeping with our times by returning to a previously unusable space, one of the primary functions of the hotel complex.
architect1

Nome & Cognome

EXPERTISE

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor

PROJECTS INVOLVED IN

Archaelogical Museum of Aquileia
Linate Airport
Oscar Niemeyer Auditorium

INTERESTS

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor

Search for any content